| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-HYD-CAL-001 | (26.5.8)20260508-GIGA Project Water Treatment System Calculation and Selection Proposal.docx EN | P1 | Migrate candidate (P1) | 2026-06-18 |
|
Proposed filename
GB-HYD-CAL-001_P1_GIGA Project Water Treatment System Calculation and Selectio_EN.docx
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/20 Analysis
| |||||
| ▸ | — | (26.5.25)20260522 GIGA Project Water Treatment System Pressurization and Make-up Unit Sizing Proposal.xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.8)Hydronic Module UPS --- 20260507.xlsx EN | Needs review | 2026-06-18 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.15)1. GIGA project constant-pressure water make-up system installation comparison analysis (end vs middle section).docx EN | Needs review | 2026-06-16 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.15)2. Comparison of Pressurized Tank and Atmospheric Tank Water Makeup Pressurization Methods.xlsx EN | Needs review | 2026-06-15 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.22 )Config Sheet - Pressurization Equipment - Pressure Maintenance - 20260618.xlsx EN | Needs review | 2026-06-22 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.20)water tank description.docx EN | Needs review | 2026-07-20 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.20)Water Tank Description V2.docx EN | Needs review | 2026-07-20 | |
|
Proposed filename
—
Target location
—
| |||||
Page 1 of 1