| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-FWU-BOM-004 | (26.5.19)Mass_Production_GIGA_Chilled_Water_Fan_Wall_Design_and_BOM_EN.xlsx EN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-FWU-BOM-004_P1_Mass Production GIGA Chilled Water Fan Wall Design and BOM_EN.xlsx
Target location
01 Modules/FWU Fan wall unit/40 BOM & Components
| |||||
| ▸ | GB-FWU-CAL-002 | 260907 New FWU Design Calculation Report.docx EN | P1 | Migrate candidate (P1) | 2026-09-08 |
|
Proposed filename
GB-FWU-CAL-002_P1_New FWU Design Calculation Report_EN.docx
Target location
01 Modules/FWU Fan wall unit/20 Analysis
| |||||
| ▸ | GB-FWU-SCH-012 | Mass Production FWU Schematic Review Checklist EN | P1 | Migrate candidate (P1) | 2026-06-09 |
|
Proposed filename
GB-FWU-SCH-012_P1_Mass Production FWU Schematic Checklist_EN
Target location
01 Modules/FWU Fan wall unit/30 Drawings & Models
| |||||
| ▸ | — | (26.5.8)Bulk US GIGA 50KW Chilled Water Fan Wall System Proposal (202600505).xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.8)Dallas, Texas GIGA Project Backplane Fan Wall Electrical Selection Document.docx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.8)GIGA - Chilled Water Fan Wall Design Proposal and Configuration List - 20260505.xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.9.08)Water-Cooled DX System Plan .xlsx EN | Needs review | 2026-09-08 | |
|
Proposed filename
—
Target location
—
| |||||
Page 1 of 1