EN/18. Big and Small Busway Connection
| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-EGL-DWG-002 | 260629 Feasibility Analysis on Aligning Small and Main Busway Heights.dwg EN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-EGL-DWG-002_P1_Feasibility Analysis on Aligning Small and Main Busway Heigh_EN.dwg
Target location
01 Modules/EGL Electrical glue (4N3 busway, big-to-small busway connection)/30 Drawings & Models
| |||||
| ▸ | — | 260629 Feasibility Analysis on Aligning Small and Main Busway Heights.pdf EN | Needs review | 2026-06-29 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | Small Busway Case Study.pdf EN | Needs review | 2026-07-03 | |
|
Proposed filename
—
Target location
—
| |||||
Page 1 of 1