| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-CTL-CRT-002 | (26.5.8)GIGA_Data_Center_1MW_EPMS_List_UL_Certification_EN_v2.xlsx EN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-CTL-CRT-002_P1_GIGA Data Center 1MW EPMS List UL Certification_EN.xlsx
Target location
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/60 Test & Certification
| |||||
| ▸ | GB-CTL-CRT-002 | (26.5.8)GIGA_Data_Center_1MW_EPMS_List_UL_Certification_EN.xlsm EN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-CTL-CRT-002_P1_GIGA Data Center 1MW EPMS List UL Certification_EN.xlsm
Target location
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/60 Test & Certification
| |||||
| ▸ | GB-CTL-PTL-002 | (26.7.29)GIGA Magnetic Bearing Main Unit IO Point List 2026.7.17 AB Integrated IO Box Scheme.xlsx EN | P1 | Migrate candidate (P1) | 2026-07-29 |
|
Proposed filename
GB-CTL-PTL-002_P1_( )GIGA Magnetic Bearing Main Unit IO Point List AB Integrat_EN.xlsx
Target location
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| |||||
| ▸ | — | (26.5.26)Bill_of_Materials.xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.26)Point_Table_20260526.xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.12)260621-GIGA Prototype Air-Cooled System - List.xlsx EN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.22)AI Pod I/O list (temperature and humidity sensor water.xlsx EN | Needs review | 2026-06-24 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.29)07 Software Interface Definition Table GIGA CDU1000 20260715.xlsx EN | Needs review | 2026-07-29 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.29)CDU1000_index_io_list_20260706.xlsx EN | Needs review | 2026-07-29 | |
|
Proposed filename
—
Target location
—
| |||||