| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-POD-CAL-001 | (26.6.23)GIGA IT Shelter V1 Container On-site Installation Structural Stress Simulation Report 0609.docx EN | P1 | Migrate candidate (P1) | 2026-06-23 |
|
Proposed filename
GB-POD-CAL-001_P1_GIGA IT Shelter Container On-site Installation Structural St_EN.docx
Target location
01 Modules/POD GIGA POD (IT pod enclosure, racks, PEMS, fire)/20 Analysis
| |||||
| ▸ | GB-POD-CRT-002 | 1. AI Pod UL certification (outsourced).xlsx EN | P1 | Migrate candidate (P1) | 2026-08-21 |
|
Proposed filename
GB-POD-CRT-002_P1_1. AI Pod UL certification outsourced_EN.xlsx
Target location
01 Modules/POD GIGA POD (IT pod enclosure, racks, PEMS, fire)/60 Test & Certification
| |||||
| ▸ | — | 260717 Recommendation on Retaining the AI Cabinet Environmental Monitoring Unit.docx EN | Needs review | 2026-07-17 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.29) 260728 GIGA V2 Batch Product List AI Pod Structure Piping Configuration List.xlsx EN | Needs review | 2026-07-30 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.29) V1 Prototype GIGA Dynamic Environment Monitoring Checklist 20260626.xlsx EN | Needs review | 2026-07-29 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.30)260729 GIGA V2 Batch Product List AI Pod Structure Piping Configuration List.xlsx EN | Needs review | 2026-07-30 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.8.14)Eaton NZM MCCB.pdf EN | Needs review | 2026-08-14 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | Amphenol Industrial Connector EN | Needs review | 2026-08-18 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | IT Cabinet Environmental Monitoring Equipment Installation Instructions.docx EN | Needs review | 2026-07-17 | |
|
Proposed filename
—
Target location
—
| |||||
Page 1 of 1