| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-HYD-DWG-001 | 20260511 1. 美国GIGA水力模块水泵UPS配电系统图、布置图(初步方案) 20260507.dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-DWG-001_P1_1. 美国GIGA水力模块水泵UPS配电系统图、布置图(初步方案)_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-DWG-002 | 260619 图纸-定压设备-定压-20260618-2(1200PLC).dwg CN | P1 | Migrate candidate (P1) | 2026-06-22 |
|
Proposed filename
GB-HYD-DWG-002_P1_图纸-定压设备-定压- -2(1200PLC_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SCH-001 | 20260511 1. 水力模块系统原理图2026.05.08(更新) .dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-SCH-001_P1_1. 水力模块系统原理图 (更新)_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SCH-002 | 20260602 _(中文版)德州达拉斯GIGA项目干冷器和主机电气原理图-V1.dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-SCH-002_P1_( )德州达拉斯GIGA项目干冷器和主机电气原理图_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SCH-003 | GIGA 园区系统原理图&UPS水力模块电气系统图.dwg CN | P1 | Migrate candidate (P1) | 2026-06-30 |
|
Proposed filename
GB-HYD-SCH-003_P1_GIGA 园区系统原理图&UPS水力模块电气系统图_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | — | 20260511 3. GIGA水力模块方案一平面出图.dwg CN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
Page 1 of 1