Browse folders
Not yet placed
01 Modules/UPS UPS e-house with battery/20 Analysis
| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-UPS-CAL-001 | 8. Lithium Battery Calculation 1500K BOL 5min 260829.pdf EN | P1 | Migrate candidate (P1) | 2026-08-29 |
|
Proposed filename
GB-UPS-CAL-001_P1_8. Lithium Battery Calculation 1500K BOL 5min_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CAL-002 | (26.8.21))GIGA Dehumidification calculation_EN.pdf EN | P1 | Migrate candidate (P1) | 2026-08-21 |
|
Proposed filename
GB-UPS-CAL-002_P1_( ))GIGA Dehumidification calculation_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-003 | GIGA-AI Mass Production_U-01 UPS E-House Layout 2026.8.13.pdf EN | P1 | Migrate candidate (P1) | 2026-08-13 |
|
Proposed filename
GB-UPS-CFD-003_P1_GIGA-AI Mass Production U-01 UPS E-House Layout_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-004 | GIGA M-UPS E-house-Cooling Distribution Section CFD Thermal Analysis Report.docx EN | P1 | Migrate candidate (P1) | 2026-08-27 |
|
Proposed filename
GB-UPS-CFD-004_P1_GIGA M-UPS E-house-Cooling Distribution Section CFD Thermal_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-004 | GIGA M-UPS E-house-Cooling Distribution Section CFD Thermal Analysis Report.pdf EN | P1 | Migrate candidate (P1) | 2026-08-27 |
|
Proposed filename
GB-UPS-CFD-004_P1_GIGA M-UPS E-house-Cooling Distribution Section CFD Thermal_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-005 | GIGA U-01 UPS E-House-IT Battery Compartment CFD Thermal Analysis Report.pdf EN | P1 | Migrate candidate (P1) | 2026-08-25 |
|
Proposed filename
GB-UPS-CFD-005_P1_GIGA U-01 UPS E-House-IT Battery Compartment CFD Thermal Ana_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-005 | GIGA U-01 UPS E-House-IT Battery Compartment CFD Thermal Analysis Report.docx EN | P2 | Migrate candidate (P1) | 2026-08-26 |
|
Proposed filename
GB-UPS-CFD-005_P2_GIGA U-01 UPS E-House-IT Battery Compartment CFD Thermal Ana_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-006 | (26.8.1)GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal Analysis Report(1).pdf EN | P1 | Migrate candidate (P1) | 2026-08-01 |
|
Proposed filename
GB-UPS-CFD-006_P1_GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal An_EN.pdf
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-006 | (26.8.1)GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal Analysis Report(1).docx EN | P2 | Migrate candidate (P1) | 2026-08-11 |
|
Proposed filename
GB-UPS-CFD-006_P2_GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal An_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-006 | GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal Analysis Report.docx EN | P3 | Migrate candidate (P1) | 2026-08-26 |
|
Proposed filename
GB-UPS-CFD-006_P3_GIGA U-01 UPS E-house-IT Distribution Section CFD Thermal An_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-021 | 06 27 Simulation Results.docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-021_P1_06 27 Simulation Results_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-022 | 0717 underfloor air supply results (no baffle temperature field not optimized).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-022_P1_0717 underfloor air supply results no baffle temperature fie_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-023 | Preliminary simulation (Model 3) 07 02 (1).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-023_P1_Preliminary simulation Model 3 07 02_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-024 | Preliminary Simulation (Model 3) 07 03 (1).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-024_P1_Preliminary Simulation Model 3 07 03_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-025 | Preliminary simulation (UPS air outlet) 7.11 (1).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-025_P1_Preliminary simulation UPS air outlet 7.11_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-026 | UPS Compartment Simulation Version 8 V8 (Bottom Supply Top Return Multi-Outlet 0719).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-026_P1_UPS Compartment Simulation Bottom Supply Top Return Multi-Ou_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-027 | UPS Room Air Distribution Simulation 7.25.docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-027_P1_UPS Room Air Distribution Simulation 7.25_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-028 | UPS Room HVAC Simulation First Edition Conclusions Reference V1 (1).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-028_P1_UPS Room HVAC Simulation First Edition Conclusions Reference_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-029 | UPS Room Simulation v11 6SIGMA (Down Supply Top Return Multi-Outlet Optimization 0723) Hot Standby Downtime.docx EN | P1 | Migrate candidate (P1) | 2026-07-26 |
|
Proposed filename
GB-UPS-CFD-029_P1_UPS Room Simulation 6SIGMA Down Supply Top Return Multi-Outl_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-030 | UPS Room Simulation Version 7 (Air Conditioning Down-Supply Top-Return 0715).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-030_P1_UPS Room Simulation Air Conditioning Down-Supply Top-Return_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-CFD-031 | UPS Room Simulation Ninth Edition 6SIGMA (Down-Supply Top-Return Multi-Outlet 0722)(1).docx EN | P1 | Migrate candidate (P1) | 2026-07-25 |
|
Proposed filename
GB-UPS-CFD-031_P1_UPS Room Simulation Ninth Edition 6SIGMA Down-Supply Top-Ret_EN.docx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-DFM-001 | DQ_DFMEA-UPS ehouse Sample_2026.9.9.xlsx EN | P1 | Migrate candidate (P1) | 2026-09-09 |
|
Proposed filename
GB-UPS-DFM-001_P1_DQ DFMEA-UPS ehouse Sample_EN.xlsx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
| ▸ | GB-UPS-PFM-001 | DQ_PFMEA-UPS ehouse Sample_2026.9.9.xlsx EN | P1 | Migrate candidate (P1) | 2026-09-09 |
|
Proposed filename
GB-UPS-PFM-001_P1_DQ PFMEA-UPS ehouse Sample_EN.xlsx
Target location
01 Modules/UPS UPS e-house with battery/20 Analysis
| |||||
Page 1 of 1