Browse folders
Not yet placed
Work in Progress Documentation
| Number | Name | Rev | Status | Modified | |
|---|---|---|---|---|---|
| ▸ | GB-HYD-3DM-003 | GIGA水处理箱.stp CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-3DM-003_P1_GIGA水处理箱_CN.stp
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-3DM-004 | GIGA水力模块24.rvt CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-3DM-004_P1_GIGA水力模块24_CN.rvt
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-3DM-007 | 202605_10MW Hydronic Module.rvt CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-3DM-007_P1_MW Hydronic Module_CN.rvt
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-DWG-001 | 20260511 1. 美国GIGA水力模块水泵UPS配电系统图、布置图(初步方案) 20260507.dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-DWG-001_P1_1. 美国GIGA水力模块水泵UPS配电系统图、布置图(初步方案)_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-DWG-002 | 260619 图纸-定压设备-定压-20260618-2(1200PLC).dwg CN | P1 | Migrate candidate (P1) | 2026-06-22 |
|
Proposed filename
GB-HYD-DWG-002_P1_图纸-定压设备-定压- -2(1200PLC_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-OMM-001 | (26.6.24)EVD驱动器 手册EVD evolution+0300005ZH - rel. 3.1 - 25.07.2011 V0.pdf CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-OMM-001_P1_EVD驱动器 手册EVD evolution+0300005ZH - rel. 3.1 - 25.07.2011_CN.pdf
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/70 Operation & Maintenance
| |||||
| ▸ | GB-HYD-OMM-002 | (26.6.24)PTS-切入阀产品手册V0.pdf CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-OMM-002_P1_PTS-切入阀产品手册_CN.pdf
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/70 Operation & Maintenance
| |||||
| ▸ | GB-HYD-SCH-001 | 20260511 1. 水力模块系统原理图2026.05.08(更新) .dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-SCH-001_P1_1. 水力模块系统原理图 (更新)_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SCH-002 | 20260602 _(中文版)德州达拉斯GIGA项目干冷器和主机电气原理图-V1.dwg CN | P1 | Migrate candidate (P1) | 2026-06-12 |
|
Proposed filename
GB-HYD-SCH-002_P1_( )德州达拉斯GIGA项目干冷器和主机电气原理图_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SCH-003 | GIGA 园区系统原理图&UPS水力模块电气系统图.dwg CN | P1 | Migrate candidate (P1) | 2026-06-30 |
|
Proposed filename
GB-HYD-SCH-003_P1_GIGA 园区系统原理图&UPS水力模块电气系统图_CN.dwg
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/30 Drawings & Models
| |||||
| ▸ | GB-HYD-SPC-001 | 膨胀罐_AT024-2031RBE 技术规格书A0.docx CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-SPC-001_P1_膨胀罐 AT024-2031RBE 技术规格书A0_CN.docx
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/10 Design
| |||||
| ▸ | GB-HYD-SPC-002 | 离心泵_E1631 2.5A 18.5kW 2PA5FAAATTZ-叶轮160.3mm UL 技术规格书 A2.docx CN | P1 | Migrate candidate (P1) | 2026-07-16 |
|
Proposed filename
GB-HYD-SPC-002_P1_离心泵 E1631 2.5A 18.5kW 2PA5FAAATTZ-叶轮160.3mm UL 技术规格书 A2_CN.docx
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/10 Design
| |||||
| ▸ | GB-HYD-SPC-003 | (26.6.24)产品样册ETS 400LV0.pdf CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-SPC-003_P1_产品样册ETS 400LV0_CN.pdf
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/10 Design
| |||||
| ▸ | GB-HYD-SPC-004 | (26.6.24)产品样册ETS 500LV0.pdf CN | P1 | Migrate candidate (P1) | 2026-06-29 |
|
Proposed filename
GB-HYD-SPC-004_P1_产品样册ETS 500LV0_CN.pdf
Target location
01 Modules/HYD Hydronic module (pumps, expansion, dosing)/10 Design
| |||||
| ▸ | — | 20260511 3. GIGA水力模块方案一平面出图.dwg CN | Needs review | 2026-06-12 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.25)20260522-GIGA项目水处理系统定压补水设备计算选型建议书.xlsx CN | Needs review | 2026-05-22 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.5.8)20260508-GIGA项目水处理系统计算选型建议书.docx CN | Needs review | 2026-05-10 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.15)1. GIGA项目端部与中段定压补水系统安装对比分析.docx CN | Needs review | 2026-06-16 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.15)2. 气压罐和常压罐补水定压方式对比.xlsx CN | Needs review | 2026-06-15 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.22)配置表-定压设备-定压-20260618.xlsx CN | Needs review | 2026-06-22 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.6.24)PTS27L_034G3917具体型号截图V0.png CN | Not a document | 2026-06-29 | |
|
Proposed filename
—
Target location
—
| |||||
| ▸ | — | (26.7.20)水箱说明V2.docx CN | Needs review | 2026-07-20 | |
|
Proposed filename
—
Target location
—
| |||||