| 详情 | 编号 | 模块 | 名称 | 版本 | 状态 | 修改日期 |
|---|---|---|---|---|---|---|
| GB-CTL-CRT-001 | CTL | EN | P1 | 待迁移 | 2026-08-03 | |
|
建议文件名
GB-CTL-CRT-001_P1_A6 T&H Room sensors Equipment sample_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/60 Test & Certification
| ||||||
| GB-CTL-CRT-002 | CTL | EN | P1 | 待迁移 | 2026-06-12 | |
|
建议文件名
GB-CTL-CRT-002_P1_GIGA Data Center 1MW EPMS List UL Certification_EN.xlsx
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/60 Test & Certification
| ||||||
| GB-CTL-CRT-002 | CTL | EN | P1 | 待迁移 | 2026-06-12 | |
|
建议文件名
GB-CTL-CRT-002_P1_GIGA Data Center 1MW EPMS List UL Certification_EN.xlsm
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/60 Test & Certification
| ||||||
| GB-CTL-DWG-001 | CTL | EN | P1 | 待迁移 | 2026-07-01 | |
|
建议文件名
GB-CTL-DWG-001_P1_42MW BA Control_EN.dwg
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-DWG-001 | CTL | EN | P1 | 待迁移 | 2026-07-01 | |
|
建议文件名
GB-CTL-DWG-001_P1_42MW BA Control_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-DWG-002 | CTL | EN | P1 | 待迁移 | 2026-07-01 | |
|
建议文件名
GB-CTL-DWG-002_P1_BA Architecture Diagram_EN.dwg
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-DWG-004 | CTL | EN | P1 | 待迁移 | 2026-10-28 | |
|
建议文件名
GB-CTL-DWG-004_P1_Cabinet Structure Drawing_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-OMM-001 | CTL | EN | P1 | 待迁移 | 1979-12-31 | |
|
建议文件名
GB-CTL-OMM-001_P1_13040901.0245.03 Product Manual ET903-M Series ET903-M 1 4 5_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| ||||||
| GB-CTL-PTL-001 | CTL | EN | P1 | 待迁移 | 2026-09-24 | |
|
建议文件名
GB-CTL-PTL-001_P1_BMS E P Modbus IO List -Standard Protocol- Third-Generation_EN.xlsx
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| ||||||
| GB-CTL-PTL-003 | CTL | EN | P1 | 待迁移 | 2026-07-29 | |
|
建议文件名
GB-CTL-PTL-003_P1_( )GIGA Magnetic Bearing Main Unit IO Point List AB Integrat_EN.xlsx
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| ||||||
| GB-CTL-REL-001 | CTL | EN | P1 | 待迁移 | 2026-08-17 | |
|
建议文件名
GB-CTL-REL-001_P1_EXTERNAL Module Firmware Serviceability_EN
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| ||||||
| GB-CTL-REL-002 | CTL | EN | P1 | 待迁移 | 2026-09-22 | |
|
建议文件名
GB-CTL-REL-002_P1_Module Firmware Serviceability_EN
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/70 Operation & Maintenance
| ||||||
| GB-CTL-SCH-001 | CTL | EN | P1 | 待迁移 | 2026-07-01 | |
|
建议文件名
GB-CTL-SCH-001_P1_42MW BA Schematic Diagram_EN.dwg
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-SCH-002 | CTL | EN | P1 | 待迁移 | 2026-07-01 | |
|
建议文件名
GB-CTL-SCH-002_P1_42MW BA Schematic Diagram -Model_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/30 Drawings & Models
| ||||||
| GB-CTL-SPC-002 | CTL | EN | P1 | 待迁移 | 2026-08-03 | |
|
建议文件名
GB-CTL-SPC-002_P1_WLDS c spec ad-s Detection Cable --Specification sheet_EN.doc
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/10 Design
| ||||||
| GB-CTL-SPC-002 | CTL | EN | P1 | 待迁移 | 2026-08-03 | |
|
建议文件名
GB-CTL-SPC-002_P1_WLDS c spec ad-s Detection Cable --Specification sheet_EN.pdf
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/10 Design
| ||||||
| GB-CTL-SPC-003 | CTL | EN | P1 | 待迁移 | 2026-10-28 | |
|
建议文件名
GB-CTL-SPC-003_P1_174kW Hybrid Air Liquid Cooled Load Bank Specification_EN.docx
目标位置
01 Modules/CTL Control system (EMS, DCIM, BA, cross-module logic)/10 Design
| ||||||